Metal Works & Galvanizing
Ain Sokhna Port Development — Metal Works
DP World — Ain Sokhna Port · 2022
View Case Study →13 projects across Specialized Works, Metal Works & Galvanizing, and Integrated Projects — Egypt's most demanding infrastructure delivered.
A selection of documented contracts across our three sectors.
| Project | Client | Sector | Scope | Year |
|---|---|---|---|---|
| Thailand Pool — Hurghada Resort | Horus for Tourist Resorts | Specialized Works | Structural strengthening of foundations and columns for resort buildings 14 & 15 | Year not available |
| 52 Mills Compound | Hassan Allam Development | Specialized Works | Architectural and structural modifications; reinforced-concrete demolition and removal | Year not available |
| Noor City | Talaat Moustafa Group | Specialized Works | Coring and removal of columns and beams; reinforced-concrete section enlargement and tying | Year not available |
| Seawater Desalination Plant — Sharm El-Sheikh | Drinking Water & Sanitation Company | Specialized Works | Cutting and removal of beams and tie-beams using diamond wire saw | Year not available |
| Gabal Asfar — Capital Sewage Line | New Urban Communities Authority | Specialized Works | Wire-saw cutting of reinforced-concrete pipes exceeding 3 m diameter, with no damage to surrounding elements | Year not available |
| Beit El Watan | New Urban Communities Authority | Specialized Works | Cutting concrete pipes for manhole-access adjustment | Year not available |
| GASCO Compressor Units (5–6) — Dahshur | GASCO | Hot-dip galvanizing (HDG) of pipework | Year not available | |
| Mansoura Water & Sanitation Stations | Holding Company for Water & Wastewater | Supply of bolts, dowels and bearings | Year not available | |
| West Port Said Grain Silos | General Company for Silos & Storage | Fabrication and hot-dip galvanizing of metal structures for equipment and stores | Year not available | |
| Aqua Joy Resort | Sunrise Group | Integrated / Turnkey Projects | Finishing of integrated hotel units | Year not available |
| Solar Power Station — Dabaa | Egyptian Air Force | Integrated / Turnkey Projects | Supply and installation of a solar power station | Year not available |
| Metrotek Factory Mosque | Egyptian-German Water Meter Co. | Integrated / Turnkey Projects | Construction of the mosque concrete structure | Year not available |
| Assiut Hydrocracking Complex | ANOPC — Assiut National Petroleum | Integrated / Turnkey Projects | Finishing of the petroleum-zone villa and the project control building | Year not available |
| Engineering Laboratory — Qena | Ministry of Irrigation & Water Resources | Integrated / Turnkey Projects | Finishing of the engineering laboratory building | Year not available |