Specialized Works
Faculty of Dentistry — Cairo University
Cairo University
View Case Study →Delivered for the Arab Contractors, this project involved diamond concrete cutting and core drilling at the Khatatba and Kafr El-Dawoud sewage stations. Controlled, low-vibration methods allowed precise openings and modifications without disturbing the surrounding structure.
The work falls within the Specialized Contracting sector, on critical utility infrastructure.
Our engineers are ready to assess your requirements and respond within 24 hours.