Metal Works & Galvanizing
High-Speed Rail (HSR)
National Authority for Tunnels
View Case Study →Across the Ain Sokhna Port development, Power Builders supplied and installed SS316 stainless-steel smooth dowels (Bar 32 mm), fabricated and installed protective barriers, and rehabilitated and strengthened beams with weather-resistant metal sections — protected by hot-dip galvanizing and thermal coatings.
Work was delivered for the Suez Canal Economic Zone with consultant Dar Al-Handasah, under leading contractors including EDECS and Hassan Allam.
Our engineers are ready to assess your requirements and respond within 24 hours.