Metal Works & Galvanizing
High-Speed Rail (HSR)
- Client
- National Authority for Tunnels
- Sector
- Metal Works & Galvanizing
- Location
- Cairo, Egypt
Project Overview
For Egypt’s High-Speed Rail, Power Builders manufactured, supplied, and installed post-tensioning (PT) bars and supplied M36 dowels and grade-52 steel fixings for the overhead contact system (OCS), all finished with hot-dip galvanizing.
Delivered for the Ministry of Transport and the National Authority for Tunnels with consultant SYSTRA, under main contractor EDECS.