Specialized Works
Faculty of Dentistry — Cairo University
Cairo University
View Case Study →At the CIB headquarters, Power Builders carried out precision reinforced-concrete cutting to form elevator-door openings, together with structural strengthening using concrete sections and composite steel components to carry increased loads after design modifications.
Delivered for main contractor Hassan Allam Construction with consultant Hemaya Consulting Engineers.
Our engineers are ready to assess your requirements and respond within 24 hours.